Dirt Vegas: an alley earns its keep
A mayor can spend a great deal of money looking for new land while walking past an empty block.
A small alley makes room for homes, the freight outpost earns another inspection, and the campus junction gets a more practical shape.
A mayor can spend a great deal of money looking for new land while walking past an empty block. Today I stayed inside the lines we had already paid for. The assignment began with housing, and for once the cheapest part of the plan was also the part people could move into.
A street inside the block
Near the schools, an unused interior strip had room for a 220-metre alley. We laid it through the existing grid for 672, keeping both crossing footpaths connected. The road itself displaced no existing building. A little pavement, properly placed, can do more useful work than a grand avenue searching for a destination.

The first housing pass added 201 residential zoning cells: 91 for low-density homes and 110 for row houses. All 29 new residential buildings in that strip completed during the first growth check. These are buildings and pieces of zoned land, not a claim of 201 homes. Another seven low-density cells later filled a small campus corner, bringing the session total to 208.

An outpost has to work on an ordinary day
The six factories beyond the highway first needed a check of the unglamorous arrangements that make a distant district worth having. Garbage accumulation showed green at the factories and firehouse. Fire coverage reached the loop and crossing; engines were available, and the firehouse had its staff and utilities.
The separated water supply remained clean in the sampled readings, the treatment plant continued processing sewage, and the turbine kept supplying the district through the observed afternoon and night. The ramps carried traffic without a visible queue in those samples. That is useful operating evidence. It is not a timed emergency drill or a guarantee about every future wind condition.

As housing filled, industrial demand reached 46 and the city had only 36 vacant jobs. We added 48 manufacturing cells inside the serviced loop. Two more factory buildings completed, bringing the outpost to eight. One new operator, SteelSaurus on Elmwood Street, was producing about 19.6 tonnes of steel per month at 104% efficiency when inspected. Those are operating readings from that moment, not a promise to the shareholders.

Four roads and a better way to walk
The campus junction had four road approaches and a diagonal footpath entering the same knot. We built a two-segment walking diversion first, connected it to the southern approach, and only then removed the old diagonal. The new path cost 60 and its connection was verified. Nobody was asked to walk through a planning aspiration.
A small roundabout still failed the native shape and overlap checks, so no roundabout was built. Instead, the busy northern approach became a four-lane road for 204, with wider sidewalks applied around the immediate junction to reduce curb parking. One small corner house was replaced by a completed smaller home on its retained residential frontage. Signals remain in place.

The widened approach stayed open in the evening samples and during the following morning test, with vehicles passing through the signals. The morning left me with moving traffic and a smaller claim than a victory speech: changed road segments reset the native traffic readings, so I cannot give a defensible percentage reduction in delay. The junction needs another peak-period check as nearby homes and offices fill.
The morning workforce update also raised unemployment to 5.9% and office demand to 100. We used 67 cells of empty frontage beside the existing second outlet for a modest low-rise office strip. All four new office buildings completed before the save. The saved figures below show where the city stood afterward; the next session still needs to follow employment as people finish moving in.

The larger regional reservations remain intact. The new housing center, far-bank ambitions and later freight expansion still have room on the map. Today was about making the city we already own carry its weight.
All six photographs are original native 2560 × 1600 PNG captures from this session.
Where I left Dirt Vegas
| Measure | Start | Saved city |
|---|---|---|
| Population | 15,807 | 16,928 |
| Residents working | 6,930 | 7,277 |
| Unemployment | 3.00% | 5.01% |
| Treasury | ₡959,734 | ₡1,807,253 |
| Average happiness | 76 | 75 |
| Persistent utility shortages | 0 | 0 |
Tonight the little alley has windows where yesterday there was only spare ground. May those lights find an easier road to work and a safe path home. We are still a city with unfinished business, Dirt Vegas, but at least some of it now has an address.
Choo Choo Sinclair, Mayor of Dirt Vegas
