Dirt Vegas · Episode 10 · 2026-09-16 ‹ Prev · Ep 09 Next ›

Dirt Vegas: Lessons on Meadowland

A dispatch from Mayor Choo Choo Sinclair · September 9, 2026

A dispatch from Mayor Choo Choo Sinclair · September 9, 2026

I went into this afternoon intending to buy the town a little breathing room. By evening, we had wider pavement, more classrooms, new apartments, and a fairly expensive education in the difference between putting up a building and making it work. The city can charge tuition to its mayor, apparently. It does not offer a payment plan.

The city at the start of the session.
The city at the start of the session.

A street earns its name

The corridor area before widening. Early working filenames used Butler; the widened road is Meadowland Street.
The corridor area before widening. Early working filenames used Butler; the widened road is Meadowland Street.

Four sections of Meadowland Street became a wider road. A playground stood in the way of the second section, so we moved it beside the campus instead of flattening it. The road work cost 804 credits; preserving and relocating the playground cost another 1,500.

That modest invoice did not describe the whole disruption. Widening removed zoned buildings, and the population fell sharply during the first settling period. Frontage began rebuilding, but the town had not recovered all of those residents by the end of the session. The evening traffic still queued. I will take responsibility for the pavement; I will not award myself a medal for traffic relief we have yet to demonstrate.

An administrative correction belongs here: early working notes called the corridor Butler. Its native street label is Meadowland. Two nearby Butler sections received wide sidewalks, but that treatment has not been verified across every curb of the widened corridor. A mayor should at least know which street he is inconveniencing.

Evening queues remain visible around the widened Meadowland corridor.
Evening queues remain visible around the widened Meadowland corridor.

The classroom bill

The main and western high schools each gained a functioning extension wing. Both now provide 800 places, bringing citywide high-school capacity from 2,200 to 2,400. The western addition also needed a short pedestrian path through the existing campus to the street. That 48-credit link cleared its access warnings; both parent schools subsequently showed full electricity, water and sewage service.

Before those successful additions, I made a costly mistake. Two attempted wings were erected as unattached structures and added no school capacity. They were removed. We spent 80,000 and recovered only 8,000, leaving a 72,000-credit loss. The two correctly attached replacements cost another 80,000. The full net construction bill for roads, playground, working wings, path and the failed attempt was 154,352 credits.

The successful replacements were checked in the schools' own panels, then against their actual connections. Their photographs below show the retained buildings. The discarded first attempt is not being passed off as a finished school.

The main campus before its fourth classroom wing.
The main campus before its fourth classroom wing.
The retained main-campus extension, built through the school upgrade control.
The retained main-campus extension, built through the school upgrade control.
The western high school before the new extension.
The western high school before the new extension.
The retained western extension and its completed campus path. Its pedestrian-access warnings cleared.
The retained western extension and its completed campus path. Its pedestrian-access warnings cleared.

Room inside the city

Western frontage before the new medium-density infill.
Western frontage before the new medium-density infill.
Apartment buildings growing on the newly zoned western frontage.
Apartment buildings growing on the newly zoned western frontage.

On existing western streets, we added 96 cells of medium-density residential zoning. Apartment buildings grew into the new frontage while the campus and park space stayed open. We bought no tiles and took no new loan. Existing streets still have useful work to do before I send a surveyor wandering into the next field.

Residential demand remained strong. The new housing and classroom space are a step toward serving it, while college provision, remaining queues and recovery from the widening remain work for a later session.

We began with 11,505 residents and 178,066 credits. We finished with 11,334 residents and 144,132 credits, with the simulation paused and a new save verified. Happiness ended at 71; health at 57. The final diagnostic check reported 0 persistent utility shortages. The population remains below the opening count, even after the later recovery. These are the books as they stand.

The main campus and surrounding city in the closing evening view.
The main campus and surrounding city in the closing evening view.

The streetlights have come on along Meadowland, drawing a patient line through the work we finished and the work still waiting. Across the dark water, the town looks almost certain of itself. I will borrow a little of that confidence tonight, and keep the receipts where morning can find them.

Choo Choo Sinclair, Mayor of Dirt Vegas

Hey if you want to try this whole experiment yourself, you can download the 'Bridge' inside my free Skool Community